Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 01:20 PM
  • 29 0499_29 0485 _20161027_073310.mp4

Date
10/27/2016
W/O
579989
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00985
PipeID
P24546
Time
6:20 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3813
Sewer Name
29 CHERRY AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_579989_TV29019_AUG2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0499
Downstream MH
29 0485
Dir. of Survey
Downstream
Length Surveyed
299.6 ft.
Total Length
299.6 ft.
Structural Index
2
Structural Quick
3211
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 29 0499 to 29 0485
MH: 29 0499MH: 29 0485downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 04990 ft. MWM - Water Mark, 5 %of cross sectional area43.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"68.2 ft. CC - Crack Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES92.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"119.3 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"141.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"153.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"192.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"214 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES241.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"287.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"294.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES299.6 ft. AMH - Downstream Manhole, Survey Ends - 29 0485

Observation photos (4)

  • Crack Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES

    68.2 ft. - Crack Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    119.3 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    214 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    294.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
0MWL
0AMH29 0499
299.6AMH29 0485
153.5TFC
141.2TFC
287.1TFC
119.3TB
241.6TFC
43.9TFC
92.3TFC
68.2CC
192.7TFC
214CM
294.7CM
0MWM

Properties (5)

additional_info
SC304560
custom_field_two
4
customer
LACSD
datetime
2016-10-27T06:20:30-07:00
sewer_category
Gravity