Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 26, 2016, 10:41 AM
  • 02 1999_02 0340_26052016_034225.mp4

Date
05/26/2016
W/O
574758
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00260
PipeID
P04656
Time
3:41 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3407
Sewer Name
02 EAST COMPTON BOULEVARD RELIEF TRUNK #2
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
36
Purpose
Routine Assessment
Project
WO_574758_TV02288_JUNE2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 1999
Downstream MH
02 0340
Dir. of Survey
Downstream
Length Surveyed
18.1 ft.
Total Length
18.1 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 02 1999 to 02 0340
MH: 02 1999MH: 02 0340downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 19990 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area14.9 ft. CL - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES18.1 ft. AMH - Downstream Manhole, Survey Ends - 02 034018.1 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK

Observation photos (1)

  • Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    14.9 ft. - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

Observations (6)

DistanceCodeObservation
18.1AMH02 0340
0AMH02 1999
0MWL
0MWM
14.9CL
18.1MGOCONNECTION AT THE MH 9 O'CLOCK

Properties (6)

additional_info
SC300667
custom_field_two
4
customer
LACSD
datetime
2016-05-26T03:41:28-07:00
sewer_category
GRAVITY
year_laid
19750612