Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2017, 06:35 AM
  • F 0254_F 0253_09052017_233616.mp4

Date
05/09/2017
W/O
630328
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00036
PipeID
P10177
Time
11:35 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4449
Sewer Name
F JOINT OUTFALL F - UNIT 3A RELIEF
City
CERRITOS
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_630328_TV02208_APR2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
66 in.
Width
66 in.
Upstream MH
F 0254
Downstream MH
F 0253
Dir. of Survey
Downstream
Length Surveyed
861.4 ft.
Total Length
861.4 ft.
Structural Index
4
Structural Quick
5_3a
Structural Rating
1311
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
1311
Pipe schematic from manhole F 0254 to F 0253
MH: F 0254MH: F 0253downstream0 ft. AMH - Upstream Manhole, Survey Begins - F 02530 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start140.1 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"389.6 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"655.9 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"834.1 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"861.4 ft. AMH - Downstream Manhole, Survey Ends - F 0253861.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish861.4 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    67.5 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
861.4AMHF 0253
2SAP
389.6TBA
861.4SAP
834.1TBA
0AMHF 0253
655.9TBA
0MWL
140.1TBA
861.4SRV
67.5SRV

Properties (6)

additional_info
SC345224
custom_field_two
2
customer
LACSD
datetime
2017-05-09T23:35:21-07:00
sewer_category
Gravity
year_laid
27333