Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 18, 2016, 06:47 AM
  • 03 0331_03 0330_17052016_234806.mp4

Date
05/17/2016
W/O
573469
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00359
PipeID
P04905
Time
11:47 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3353
Sewer Name
03 ANAHEIM STREET TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
WO_573469_JUNE2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
03 0331
Downstream MH
03 0330
Dir. of Survey
Downstream
Length Surveyed
332.2 ft.
Total Length
332.2 ft.
Structural Index
3
Structural Quick
5C3L
Structural Rating
425
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
3
Overall Quick
Overall Rating
537
Pipe schematic from manhole 03 0331 to 03 0330
MH: 03 0331MH: 03 0330downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03 03312 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start49 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start72.6 ft. SMW - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Start172 ft. SMW - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish298.9 ft. MWL - Water Level, 40 %of cross sectional area329.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish332.2 ft. AMH - Downstream Manhole, Survey Ends - 03 0330332.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    49 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    72.6 ft. - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
329.5SSS
2SAP
72.6SMW
298.9MWL
0MWL
329.5SAP
0MWM
2SSS
332.2AMH03 0330
172SMW
329.5DSZ
49DSZ
332.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMH03 0331

Properties (5)

additional_info
SC305633
custom_field_two
1
customer
LACSD
datetime
2016-05-17T23:47:45-07:00
sewer_category
GRAVITY