Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2017, 08:42 AM
Date
05/25/2017
W/O
635598
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00127
PipeID
P09645
Time
1:42 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4607
Sewer Name
C JOINT OUTFALL C - UNIT 4B
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
20
Purpose
Routine Assessment
Project
WO_635598_TV03143_MAY2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
C 0619
Downstream MH
C 0121
Dir. of Survey
Downstream
Length Surveyed
579 ft.
Total Length
579 ft.
Structural Index
3
Structural Quick
573l
Structural Rating
704
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
704
Pipe schematic from manhole C 0619 to C 0121
MH: C 0619MH: C 0121downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - C 06190 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Start38.6 ft. SRP - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start38.6 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Finish181.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"431.4 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"579 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish579 ft. AMH - Downstream Manhole, Survey Ends - C 0121579 ft. SRP - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    38.6 ft. - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
38.6SRP
0MGOCONNECTION AT MH 3 O'CLOCK
579SAP
0AMHC 0619
2.1MGOMAG COAT
579AMHC 0121
431.4TFA
579SRP
0MWM
0MWL
2.1SAP
38.6SRV
2.1SRV
181.1TF

Properties (4)

additional_info
SC345318
custom_field_two
2
customer
LACSD
datetime
2017-05-25T01:42:30-07:00