Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2017, 11:19 AM
  • 01 1176A_01 1176_04142017_042312.mp4

Date
04/14/2017
W/O
630307
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00225
PipeID
P02029
Time
4:19 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4428
Sewer Name
01 WILCOX AVENUE TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
WO_630307_TV01125_APR2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1176A
Downstream MH
01 1176
Dir. of Survey
Downstream
Length Surveyed
194.4 ft.
Total Length
194.4 ft.
Structural Index
3
Structural Quick
3G2E
Structural Rating
172
O&M Index
2
O&M Quick
4131
O&M Rating
83
Overall Index
2
Overall Quick
Overall Rating
255
Pipe schematic from manhole 01 1176A to 01 1176
MH: 01 1176AMH: 01 1176downstream0 ft. MGO - General Observation - ACTIVE CONNECTIONS AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 1176A0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start41.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"47.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start49.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"103.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.2 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES192.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish192.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish192.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish194.4 ft. AMH - Downstream Manhole, Survey Ends - 01 1176

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    47.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    180.2 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0MGOACTIVE CONNECTIONS AT MH 3 O'CLOCK
141.6TFA
103.1TFA
2DAGS
4SAV
0MWL
194.4AMH01 1176
47.3SSS
67.2TFA
95.5TFA
41.7TFA
192.6DAGS
0AMH01 1176A
144.4TFA
192.6SSS
0MWM
49.3TF
180.2DAGS
192.6SAV

Properties (5)

additional_info
SC306999
custom_field_two
2
customer
LACSD
datetime
2017-04-14T04:19:39-07:00
sewer_category
Gravity