Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 11, 2017, 06:56 AM
  • 01 0794_01 0793_10042017_235651.mp4

Date
04/10/2017
W/O
630043
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00197
PipeID
P01496
Time
11:56 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4424
Sewer Name
01 BULLIS ROAD-TEMPLE STREET TRUNK
City
LYNWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
17
Purpose
Routine Assessment
Project
WO_630043_TV01008_APR2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0794
Downstream MH
01 0793
Dir. of Survey
Downstream
Length Surveyed
295 ft.
Total Length
295 ft.
Structural Index
4
Structural Quick
4K00
Structural Rating
232
O&M Index
2
O&M Quick
412K
O&M Rating
120
Overall Index
3
Overall Quick
Overall Rating
352
Pipe schematic from manhole 01 0794 to 01 0793
MH: 01 0794MH: 01 0793downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 07940 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 65 %of cross sectional area2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start12.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"134.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"164.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"182.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"215.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"233.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"282.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"293.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish293.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish295 ft. AMH - Downstream Manhole, Survey Ends - 01 0793295 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
112.8TFC
282.6TFC
76.4TFC
0AMH01 0794
295AMH01 0793
295MGOCONNECTION AT MH 9 O'CLOCK
2FM
293.1FM
0MWL
12.6TFC
64.3TFC
233.8TFC
134.2TFC
0MWM
293.1DAGS
267.8TFC
215.7TFC
2DAGS
164.5TFC
182.6TFC

Properties (5)

additional_info
SC306993
custom_field_two
3
customer
LACSD
datetime
2017-04-10T23:56:33-07:00
sewer_category
Gravity