Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2017, 06:19 AM
  • 29 0273_29 0263 _16032017_232012.mpg

Date
03/16/2017
W/O
624460
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00550
PipeID
P24181
Time
11:19 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4383
Sewer Name
29 WEST HILL STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_624460_TV29035_MAR2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0263
Downstream MH
29 0273
Dir. of Survey
Upstream
Length Surveyed
299 ft.
Total Length
299.1 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 29 0263 to 29 0273
MH: 29 0263MH: 29 0273upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 027325.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES34.7 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"45.3 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"50.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"52.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"58.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES88.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"103.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"142.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"169.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"217.4 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"241.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"295.9 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES299.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK299.1 ft. MWL - Water Level, 5 %of cross sectional area299.1 ft. MWM - Water Mark, 5 %of cross sectional area299.1 ft. AMH - Downstream Manhole, Survey Begins - 29 0263

Observation photos (5)

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    3.2 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    221 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"

    253.8 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    264.4 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    273.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK
221CL
210.7TFC
0MWL
57.6TF
248.8TFC
240.7TF
3.2CL
81.7TFA
129.7TF
246.3TFC
156.6TF
253.8TB
273.9CM
0MWM
299.1AMH29 0273
195.8TF
0AMH29 0263
264.4TB

Properties (4)

additional_info
SC306892
custom_field_two
4
customer
LACSD
datetime
2017-03-16T23:19:13-07:00