Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2017, 09:08 AM
  • 20 0073_20 0072_29032017_021411.mpg

Date
03/29/2017
W/O
624441
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00742
PipeID
P18994
Time
2:08 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4403
Sewer Name
20 TRUNK "A"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
02
Purpose
Routine Assessment
Project
WO_624441_TV20023_MAR2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0072
Downstream MH
20 0073
Dir. of Survey
Upstream
Length Surveyed
366.9 ft.
Total Length
366.9 ft.
Structural Index
3
Structural Quick
3M2B
Structural Rating
242
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
366
Pipe schematic from manhole 20 0072 to 20 0073
MH: 20 0072MH: 20 0073upstream0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 20 007333.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish80.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start82.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"134.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"181.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"233.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"283.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"336.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"349.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start364.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - MAG COAT364.8 ft. MGO - General Observation - MAG COAT366.9 ft. MWL - Water Level, 5 %of cross sectional area366.9 ft. AMH - Downstream Manhole, Survey Begins - 20 0072366.9 ft. MWM - Water Mark, 5 %of cross sectional area

Observation photos (3)

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start - MAG COAT

    2.1 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    17.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    286.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
17.5SAV
284TFC
333TFC
30.5TFC
366.9SSS
286.3SSS
185.3TFC
232.3TF
2.1DSZMAG COAT
83.2TFC
0MWL
133TFC
0AMH20 0072
366.9SAV
0MWM
312.3DSZ
2.1MGOMAG COAT
366.9AMH20 0073

Properties (4)

additional_info
SC345162
custom_field_two
2
customer
LACSD
datetime
2017-03-29T02:08:37-07:00