Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 17, 2017, 08:06 PM
  • A 0343_A 0342_7172017_131524.mp4

Date
07/17/2017
W/O
0636060
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00325
PipeID
P21654
Time
1:06 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7461A
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
01
Purpose
Routine Assessment
Project
20170713SHO_JOA1A_SAN_JOSE_CREEK_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Upstream MH
A 0343
Downstream MH
A 0342
Dir. of Survey
Downstream
Length Surveyed
668.3 ft.
Total Length
668.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole A 0343 to A 0342
MH: A 0343MH: A 0342downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01100 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area10.5 ft. MGO - General Observation - 90% MAG33.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start330.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish668.3 ft. MSA - Survey Abandoned - BOAT NOT PULLING, POSSIBLE SIPHON AHEAD

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    33.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
33.2SAP
330.3SAP
0AMH0110
10.5MGO90% MAG
0MWL
0MWM
668.3MSABOAT NOT PULLING, POSSIBLE SIPHON AHEAD

Properties (2)

customer
LACSD
datetime
2017-07-17T13:06:46-07:00