- Date
- 05/25/2017
- W/O
- 635526
- Weather
- Dry
- Operator/Surveyor
- JUAN B
- Sewer ID
- Z00635
- PipeID
- P25913
- Time
- 1:00 AM
- Certificate
- U-715-07000770
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K4531
- Sewer Name
- 15 TYLER AVENUE RELIEF TRUNK
- City
- EL MONTE
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 17
- Purpose
- Routine Assessment
- Project
- WO_635526_TV15082_MAY2017
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 24 in.
- Width
- 24 in.
- Upstream MH
- 15 1166
- Downstream MH
- 15 1167
- Dir. of Survey
- Upstream
- Length Surveyed
- 30.1 ft.
- Total Length
- 30.1 ft.
- Structural Index
- 0
- Structural Quick
- 0000
- Structural Rating
- 0
- O&M Index
- 2
- O&M Quick
- 2600
- O&M Rating
- 12
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 12
Pipe schematic from manhole 15 1166 to 15 1167 Observation photos (1)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start