Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 19, 2017, 08:14 AM
  • 18 1016_18 1015 _19042017_011448.mp4

Date
04/19/2017
W/O
630156
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00677
PipeID
P14870
Time
1:14 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4268
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 1
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_630156_TV18008_APR2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1016
Downstream MH
18 1015
Dir. of Survey
Downstream
Length Surveyed
269.2 ft.
Total Length
269.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 1016 to 18 1015
MH: 18 1016MH: 18 1015downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 10160 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0.1 ft. MGO - General Observation - LINER2.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAGNESIUM COATING START18.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"52.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"108.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"138.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"198.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"229.5 ft. VC - Vermin Cockroach244.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"264.2 ft. MGO - General Observation - MAGNESIUM COATING END266 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish269.2 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK ACTIVE269.2 ft. AMH - Downstream Manhole, Survey Ends - 18 1015

Observation photos (1)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2.2MGOMAGNESIUM COATING START
138.9TFA
198.8TFA
18.7TFA
266DAGS
229.5VC
264.2MGOMAGNESIUM COATING END
269.2MGOLATERAL AT MH 3 OCLOCK ACTIVE
0AMH18 1016
52.5TFA
0MWL
269.2AMH18 1015
108.9TFA
244.3TFA
0MWM
2.1DAGS
0.1MGOLINER

Properties (6)

additional_info
SC306848
custom_field_two
4
customer
LACSD
datetime
2017-04-19T01:14:36-07:00
sewer_category
Gravity
year_laid
38344