Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2017, 10:21 AM
  • 14 0468_14 0467 _01242017_022140.mp4

Date
01/24/2017
W/O
618867
Weather
Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00580
PipeID
P18557
Time
2:21 AM
Certificate
U111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4219
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
WO_618867_TV14023_FEB2017
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0467
Downstream MH
14 0468
Dir. of Survey
Upstream
Length Surveyed
339.6 ft.
Total Length
339.6 ft.
Structural Index
3
Structural Quick
3M2L
Structural Rating
334
O&M Index
2
O&M Quick
2M00
O&M Rating
136
Overall Index
2
Overall Quick
Overall Rating
470
Pipe schematic from manhole 14 0467 to 14 0468
MH: 14 0467MH: 14 0468upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 14 04680 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish9.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish30 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"57 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"111.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"135.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"261.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"322.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"334.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start337.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start337.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start339.6 ft. MWL - Water Level, 20 %of cross sectional area339.6 ft. AMH - Downstream Manhole, Survey Begins - 14 0467339.6 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
2DAGS
0MWL
2SAP
309.6TFC
330SSS
228.3TFC
77.7TFC
339.6DAGS
339.6AMH14 0468
203.9TFC
339.6SAP
5SSS
282.6TFC
0AMH14 0467
150.9TFC
253TFC
17.2TFC
0MWM

Properties (5)

additional_info
SC306721
custom_field_two
2
customer
LACSD
datetime
2017-01-24T02:21:14-08:00
sewer_category
Gravity