Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 22, 2016, 04:34 PM
  • 20 0260_20 0259_12202016_195929.mp4

Date
09/22/2016
W/O
597309
Weather
Dry
Operator/Surveyor
S LOPEZ
Sewer ID
Z00753
PipeID
P19227
Time
9:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3787
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
WO_597309_TV20009_OCT2016
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0259
Downstream MH
20 0260
Dir. of Survey
Upstream
Length Surveyed
372.1 ft.
Total Length
372.1 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
222
O&M Index
2
O&M Quick
412N
O&M Rating
152
Overall Index
3
Overall Quick
Overall Rating
374
Pipe schematic from manhole 20 0259 to 20 0260
MH: 20 0259MH: 20 0260upstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 20 02602.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish74.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"372.1 ft. MWL - Water Level, 25 %of cross sectional area372.1 ft. MWM - Water Mark, 50 %of cross sectional area372.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start372.1 ft. AMH - Downstream Manhole, Survey Begins - 20 0259372.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
100.3TFC
0MWL
369.9SAP
152.5TFC
249.6TFC
201.4TFC
372.1MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
0DAGS
47.8TFC
0AMH20 0259
0SAP
372.1MGOACTIVE CONNECTION AT MH 3 O'CLOCK
372.1AMH20 0260
369.9DAGS
297.8TFC

Properties (5)

additional_info
SC306325
custom_field_two
3
customer
LACSD
datetime
2016-09-22T09:34:42-07:00
sewer_category
Gravity