Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2016, 07:09 AM
  • 20 0265_20 0264_10262016_001042.mp4

Date
10/26/2016
W/O
597309
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19232
Time
12:09 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3793
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
WO_597309_TV20009_OCT2016
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0265
Downstream MH
20 0264
Dir. of Survey
Downstream
Length Surveyed
145.9 ft.
Total Length
145.9 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
84
O&M Index
2
O&M Quick
412E
O&M Rating
60
Overall Index
3
Overall Quick
Overall Rating
144
Pipe schematic from manhole 20 0265 to 20 0264
MH: 20 0265MH: 20 0264downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02652 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"59.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"111.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"144 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish144 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish145.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0264145.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2DAGS
0MWL
0MWM
2SAP
10.8TFC
144DAGS
144SAP
145.9AMH20 0264
111.9TFC
0AMH20 0265
145.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
59.2TFC

Properties (5)

additional_info
SC306331
custom_field_two
3
customer
LACSD
datetime
2016-10-26T00:09:53-07:00
sewer_category
Gravity