Wastewater/Activity/PacpInspection/1.0Oct 6, 2016, 06:21 AM
  • 18 0103_18 0102 _05102016_233701.mp4

Date
10/05/2016
W/O
597011
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00698
PipeID
P13923
Time
11:21 PM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3731
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_597011_TV18083_OCT2016
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0103
Downstream MH
18 0102
Dir. of Survey
Downstream
Length Surveyed
357 ft.
Total Length
357 ft.
Structural Index
2
Structural Quick
3L2M
Structural Rating
333
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
473
Pipe schematic from manhole 18 0103 to 18 0102
MH: 18 0103MH: 18 0102downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01032 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"13.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"57.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"111.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"114.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"163.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"166.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"212.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"215.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"261.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"264.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"313.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"316.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"324.5 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES342.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES346.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"349.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"354.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish354.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish354.2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish355.6 ft. MGO - General Observation - CONNECTION AT MH 3 ACTIVE356.9 ft. MGO - General Observation - CONNECTION AT MH 9 ACTIVE357 ft. AMH - Downstream Manhole, Survey Ends - 18 0102

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    324.5 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    342.5 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (29)

DistanceCodeObservation
313.2TFC
0MWL
0MWM
355.6MGOCONNECTION AT MH 3 ACTIVE
346.8TFC
111.8TFC
0AMH18 0103
354.2DAGS
342.5CL
261.3TFC
264.2TFC
354.2SSS
2DAGS
354.2SAV
13.5TFC
349.9TFC
215.1TFC
2SSS
114.7TFC
356.9MGOCONNECTION AT MH 9 ACTIVE
316.4TFC
163.6TFA
11TFA
2SAV
324.5CL
357AMH18 0102
212.4TFA
57.4TFA
166.2TFC

Properties (5)

additional_info
SC303718
custom_field_two
2
customer
LACSD
datetime
2016-10-05T23:21:00-07:00
sewer_category
Gravity