Date
01/31/2017
W/O
618961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19051
Time
4:11 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4225
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
WO_618961_TV20027_FEB2017
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0127
Downstream MH
20 0128
Dir. of Survey
Upstream
Length Surveyed
387.1 ft.
Total Length
387.1 ft.
Structural Index
2
Structural Quick
3N2N
Structural Rating
373
O&M Index
2
O&M Quick
2N00
O&M Rating
154
Overall Index
2
Overall Quick
Overall Rating
527
Pipe schematic from manhole 20 0127 to 20 0128
MH: 20 0127MH: 20 0128upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01281.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish87.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"184.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"290.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"294.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"366.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start385.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start385.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start387.1 ft. MWM - Water Mark, 20 %of cross sectional area387.1 ft. AMH - Downstream Manhole, Survey Begins - 20 0127387.1 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
20.5SAP
0MWM
93TFC
2DAGS
385.3SAP
97TFC
299.6TFC
387.1AMH20 0128
385.3SSS
0AMH20 0127
202.4TFC
385.3DAGS
295.2TFC
2SSS
0MWL

Properties (5)

additional_info
SC306727
custom_field_two
2
customer
LACSD
datetime
2017-01-31T04:11:26-08:00
sewer_category
Gravity