Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2017, 07:23 AM
  • 20 0116_20 0542_01302017_232330.mp4

Date
01/30/2017
W/O
618961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19039
Time
11:23 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4225
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
WO_618961_TV20027_FEB2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0116
Downstream MH
20 0542
Dir. of Survey
Downstream
Length Surveyed
370.8 ft.
Total Length
370.8 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2212
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole 20 0116 to 20 0542
MH: 20 0116MH: 20 0542downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01160 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start72.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"76.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"174.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"174.4 ft. RFL - Roots Fine Lateral, at 09 o'clock178.3 ft. RFL - Roots Fine Lateral, at 03 o'clock178.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"263.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"280.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"370.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish370.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0542

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
370.8DAGS
178.3RFL
2.2SSS
0AMH20 0116
76.9TFC
263.2TFC
0MWL
370.8SSS
280.5TFC
0MWM
72.6TFC
3.9SAP
174.4TFC
178.3TFC
174.4RFL
370.8SAP
2DAGS
370.8AMH20 0542

Properties (5)

additional_info
SC306727
custom_field_two
2
customer
LACSD
datetime
2017-01-30T23:23:07-08:00
sewer_category
Gravity