Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2016, 08:32 AM
  • E 0033_E 0031_20161026_014733.mp4

Date
10/26/2016
W/O
597393
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P11259
Time
1:32 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3863
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
LYNWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
V
Project
WO_597393_TV01124_OCT2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
E 0031
Downstream MH
E 0033
Dir. of Survey
Upstream
Length Surveyed
50.4 ft.
Total Length
50.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole E 0031 to E 0033
MH: E 0031MH: E 0033upstream0 ft. OBN - Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock, Finish - NOT VISIBLE0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - MAGNESIUM COATING FINISH0 ft. OBN - Obstacles Construction Debris, 25 %of cross sectional area, from 04 to 08 o'clock - NOT VISIBLE0 ft. MSA - Survey Abandoned - SEVERE DEBRIS 25%48.4 ft. OBN - Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock, Start - NOT VISIBLE48.4 ft. MGO - General Observation - MAGNESIUM COATING START48.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.4 ft. MGO - Reversal Inspection50.4 ft. MWL - Water Level, 15 %of cross sectional area50.4 ft. AMH - Downstream Manhole, Survey Begins - E 003150.4 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    50.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (12)

DistanceCodeObservation
2OBNNOT VISIBLE
50.4OBNNOT VISIBLE
50.4SAP
0MGO
2MGOMAGNESIUM COATING START
0MWL
50.4MGOMAGNESIUM COATING FINISH
2SAP
50.4OBNNOT VISIBLE
0AMHE 0031
0MWM
50.4MSASEVERE DEBRIS 25%

Properties (5)

additional_info
SC301942
custom_field_two
4
customer
LACSD
datetime
2016-10-26T01:32:44-07:00
sewer_category
Gravity