Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 20, 2016, 10:41 AM
  • E 0106_E 0056_20161020_045708.mp4

Date
10/20/2016
W/O
597393
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P11286
Time
3:41 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3858
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
LYNWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_597393_TV01124_OCT2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0106
Downstream MH
E 0056
Dir. of Survey
Downstream
Length Surveyed
333.1 ft.
Total Length
333.1 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
195
Pipe schematic from manhole E 0106 to E 0056
MH: E 0106MH: E 0056downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 01060 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK MADE0 ft. MGO - General Observation - COCKROACHES IN MANHOLE3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.2 ft. MGO - General Observation - Magnesium hydroxide coating start328.8 ft. MGO - General Observation - Magnesium hydroxide coating finish328.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.1 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK ACTIVE333.1 ft. AMH - Downstream Manhole, Survey Ends - E 0056

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    328.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (11)

DistanceCodeObservation
0MWL
3.2SAP
333.1MGOCONNECTION AT THE MH 9 O'CLOCK ACTIVE
333.1AMHE 0056
0MWM
328.8MGOMagnesium hydroxide coating finish
0AMHE 0106
0MGOCONNECTION AT THE MH 3 O'CLOCK MADE
0MGOCOCKROACHES IN MANHOLE
3.2MGOMagnesium hydroxide coating start
328.8SAP

Properties (5)

additional_info
SC301937
custom_field_two
4
customer
LACSD
datetime
2016-10-20T03:41:22-07:00
sewer_category