Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2017, 08:43 AM
  • 22 0281_22 0280 _01192017_005903.mpg

Date
01/19/2017
W/O
613442
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16567
Time
12:43 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4082
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_613442_TV22014_JAN2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0281
Downstream MH
22 0280
Dir. of Survey
Downstream
Length Surveyed
240.6 ft.
Total Length
240.6 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
141
O&M Index
2
O&M Quick
2H12
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
237
Pipe schematic from manhole 22 0281 to 22 0280
MH: 22 0281MH: 22 0280downstream0 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02810 ft. MWM - Water Mark, 15 %of cross sectional area2.3 ft. MGO - General Observation - MAGNESIUM H.O. START2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"75.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"80 ft. MGP - General Photograph96.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"99.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"103.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"148.1 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"156 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"159.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"238.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish238.5 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH238.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ACTIVE240.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0280240.6 ft. VC - Vermin Cockroach

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    80 ft. - General Photograph

Observations (22)

DistanceCodeObservation
2.3MGOMAGNESIUM H.O. START
238.5DAGS
240.6MGOCONNECTION AT MH 3 O'CLOCK ACTIVE
0VC
148.1TBA
103.7TFC
238.5MGOMAGNEZIUM H.O. FINISH
96.2TBA
159.9TFC
0MWL
99.9TBA
238.5SAV
0AMH22 0281
156TFC
2.3DAGS
240.6AMH22 0280
42.9TFA
0MWM
80MGP
240.6VC
75.3TFA
2.3SAV

Properties (5)

additional_info
SC318623
custom_field_two
3
customer
LACSD
datetime
2017-01-19T00:43:03-08:00
sewer_category
Gravity