Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2017, 07:40 AM
  • 22 0284_22 0283_01182017_235438.mpg

Date
01/18/2017
W/O
613442
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16570
Time
11:40 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4082
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_613442_TV22014_JAN2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0284
Downstream MH
22 0283
Dir. of Survey
Downstream
Length Surveyed
249.9 ft.
Total Length
249.9 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
147
O&M Index
2
O&M Quick
2I12
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
247
Pipe schematic from manhole 22 0284 to 22 0283
MH: 22 0284MH: 22 0283downstream0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02840 ft. MWL - Water Level, 10 %of cross sectional area2.4 ft. MGO - General Observation - MAGNESIUM H.O. START2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"47.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"55.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"79.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"90.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"148 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"157.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"159.6 ft. MGP - General Photograph168.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"200.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"223.4 ft. MGP - General Photograph246.1 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH246.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish246.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish249.9 ft. VC - Vermin Cockroach249.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0283249.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    159.6 ft. - General Photograph

  • General Photograph

    223.4 ft. - General Photograph

Observations (24)

DistanceCodeObservation
2.4MGOMAGNESIUM H.O. START
249.9VC
90.4TFA
223.4MGP
2.4DAGS
157.6TFA
148TFA
246.1MGOMAGNEZIUM H.O. FINISH
168.4TFC
0VC
159.6MGP
0MWM
246.1SAV
0AMH22 0284
7.2TFA
0MWL
2.4SAV
249.9AMH22 0283
200.5TFA
47.3TFA
55.3TFA
249.9MGOCONNECTION AT MH 3 O'CLOCK CAPPED
246.1DAGS
79.8TFA

Properties (5)

additional_info
SC318623
custom_field_two
3
customer
LACSD
datetime
2017-01-18T23:40:55-08:00
sewer_category
Gravity