Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 05:55 AM
  • E 0044_E 0043_20161026_231852.mp4

Date
10/26/2016
W/O
597390
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P11271
Time
10:55 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3865
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
WO_597390_TV01088_OCT2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0043
Downstream MH
E 0044
Dir. of Survey
Upstream
Length Surveyed
296.8 ft.
Total Length
296.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
3121
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole E 0043 to E 0044
MH: E 0043MH: E 0044upstream0 ft. OBN - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock, Finish0 ft. AMH - Upstream Manhole, Survey Ends - E 00442.8 ft. VC - Vermin Cockroach2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.8 ft. MGO - General Observation - MAGNESIUM COATING FINISH80.6 ft. OBN - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock, Start276.4 ft. OBN - Obstacles Construction Debris, 10 %of cross sectional area, from 04 to 08 o'clock - NOT VISIBLE294.7 ft. MGO - General Observation - MAGNESIUM COATING START294.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296.8 ft. MWL - Water Level, 15 %of cross sectional area296.8 ft. MWM - Water Mark, 20 %of cross sectional area296.8 ft. AMH - Downstream Manhole, Survey Begins - E0 043296.8 ft. MGO - General Observation - ROACHES IN MH

Observation photos (4)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock, Start

    216.2 ft. - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    294 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (13)

DistanceCodeObservation
296.8OBN
0MWL
294VC
0MWM
20.4OBNNOT VISIBLE
294SAP
0AMHE0 043
216.2OBN
2.1MGOMAGNESIUM COATING START
2.1SAP
294MGOMAGNESIUM COATING FINISH
0MGOROACHES IN MH
296.8AMHE 0044

Properties (5)

additional_info
SC301945
custom_field_two
4
customer
LACSD
datetime
2016-10-26T22:55:32-07:00
sewer_category
Gravity