Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 07:39 AM
  • E 0035_E 0034A_20161027_005055.mp4

Date
10/27/2016
W/O
597390
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P11262
Time
12:39 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3865
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
18
Purpose
Routine Assessment
Project
WO_597390_TV01088_OCT2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0035
Downstream MH
E 0034A
Dir. of Survey
Downstream
Length Surveyed
183.7 ft.
Total Length
183.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole E 0035 to E 0034A
MH: E 0035MH: E 0034Adownstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. AMH - Upstream Manhole, Survey Begins - E 00352.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNESIUM COATING START179.8 ft. MGO - General Observation - MAGNESIUM COATING FINISH179.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish179.8 ft. VC - Vermin Cockroach183.7 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK ACTIVE183.7 ft. AMH - Downstream Manhole, Survey Ends - E 0034A

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    179.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (11)

DistanceCodeObservation
0MWL
179.8MGOMAGNESIUM COATING FINISH
0MWM
0MGOROACHES IN MH
179.8SAP
183.7MGOLATERAL AT MH 9 OCLOCK ACTIVE
2.1SAP
0AMHE 0035
2.1MGOMAGNESIUM COATING START
183.7AMHE 0034A
179.8VC

Properties (5)

additional_info
SC301945
custom_field_two
4
customer
LACSD
datetime
2016-10-27T00:39:47-07:00
sewer_category