Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 09:01 AM
  • E 0030_E 0029_20161027_023521.mp4

Date
10/27/2016
W/O
597390
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P07613
Time
2:01 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3865
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Routine Assessment
Project
WO_597390_TV01088_OCT2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0030
Downstream MH
E 0029
Dir. of Survey
Downstream
Length Surveyed
650.5 ft.
Total Length
650.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
3111
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole E 0030 to E 0029
MH: E 0030MH: E 0029downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00300 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. VC - Vermin Cockroach2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNESIUM COATING START147.7 ft. OBN - Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock, Start - NOT VISIBLE624.5 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"645.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish645.4 ft. OBN - Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock, Finish645.4 ft. MGO - General Observation - MAGNESIUM COATING FINISH650.5 ft. AMH - Downstream Manhole, Survey Ends - E 0029650.5 ft. MGO - General Observation - ROACHES IN MH

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock, Start - NOT VISIBLE

    147.7 ft. - Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock, Start - NOT VISIBLE

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    624.5 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    645.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (13)

DistanceCodeObservation
2.1SAP
0AMHE 0030
147.7OBNNOT VISIBLE
650.5AMHE 0029
0MWL
645.4SAP
645.4OBN
624.5TBA
645.4MGOMAGNESIUM COATING FINISH
2.1MGOMAGNESIUM COATING START
650.5MGOROACHES IN MH
0MWM
0VC

Properties (5)

additional_info
SC301945
custom_field_two
4
customer
LACSD
datetime
2016-10-27T02:01:46-07:00
sewer_category
Gravity