Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 09:39 AM
  • E 0029_E 0028_20161027_024428.mp4

Date
10/27/2016
W/O
597390
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P07612
Time
2:39 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3865
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Routine Assessment
Project
WO_597390_TV01088_OCT2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0029
Downstream MH
E 0028
Dir. of Survey
Downstream
Length Surveyed
8.3 ft.
Total Length
8.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole E 0029 to E 0028
MH: E 0029MH: E 0028downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00290 ft. MGO - General Observation - ROACHES IN MH0 ft. MWM - Water Mark, 20 %of cross sectional area2.8 ft. MGO - General Observation - MAGNESIUM COATING START2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.3 ft. MSA - Survey Abandoned - SEVERE DEBRIS 25%8.3 ft. MGO - General Observation - MAGNESIUM COATING FINISH8.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish8.3 ft. OBN - Obstacles Construction Debris, 25 %of cross sectional area, from 04 to 08 o'clock

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Survey Abandoned - SEVERE DEBRIS 25%

    8.3 ft. - Survey Abandoned - SEVERE DEBRIS 25%

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    8.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

  • Obstacles Construction Debris, 25 %of cross sectional area, from 04 to 08 o'clock

    8.3 ft. - Obstacles Construction Debris, 25 %of cross sectional area, from 04 to 08 o'clock

Observations (10)

DistanceCodeObservation
2.8MGOMAGNESIUM COATING START
8.3MSASEVERE DEBRIS 25%
0MWL
0AMHE 0029
8.3MGOMAGNESIUM COATING FINISH
2.8SAP
8.3SAP
0MGOROACHES IN MH
8.3OBN
0MWM

Properties (5)

additional_info
SC301945
custom_field_two
3
customer
LACSD
datetime
2016-10-27T02:39:15-07:00
sewer_category
Gravity