Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 08:34 AM
  • 32 0131A_32 0131_10272016_013538.mp4

Date
10/27/2016
W/O
592230
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19878
Time
1:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3795
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
WO_592230_TV32048_SEP2016
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0131A
Downstream MH
32 0131
Dir. of Survey
Downstream
Length Surveyed
203 ft.
Total Length
203 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
120
O&M Index
2
O&M Quick
2G00
O&M Rating
80
Overall Index
3
Overall Quick
Overall Rating
200
Pipe schematic from manhole 32 0131A to 32 0131
MH: 32 0131AMH: 32 0131downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 0131A0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.6 ft. MGO - General Observation - MAG COATING 90%201.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish201.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish203 ft. AMH - Downstream Manhole, Survey Ends - 32 0131

Observation photos (3)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMH32 0131A
0MGOCOCKROACHES IN MANHOLE
201.5SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
203AMH32 0131
2.9SAP
201.5DAGS
0MWL
5.6MGOMAG COATING 90%
0MWM
2DAGS

Properties (5)

additional_info
SC306333
custom_field_two
3
customer
LACSD
datetime
2016-10-27T01:34:45-07:00
sewer_category
Gravity