Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 10:03 AM
  • 32 0129_32 0128_10272016_033406.mp4

Date
10/27/2016
W/O
592230
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19875
Time
3:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3795
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
WO_592230_TV32048_SEP2016
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0129
Downstream MH
32 0128
Dir. of Survey
Downstream
Length Surveyed
399.5 ft.
Total Length
399.5 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
237
O&M Index
2
O&M Quick
412O
O&M Rating
162
Overall Index
3
Overall Quick
Overall Rating
399
Pipe schematic from manhole 32 0129 to 32 0128
MH: 32 0129MH: 32 0128downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 01290 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT 80%397.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish397.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish399.5 ft. AMH - Downstream Manhole, Survey Ends - 32 0128

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
397.1DAGS
2DAGS
399.5AMH32 0128
0MWM
2SAP
0AMH32 0129
0MWL
2MGOMAG COAT 80%
397.1SAP

Properties (5)

additional_info
SC306333
custom_field_two
3
customer
LACSD
datetime
2016-10-27T03:03:15-07:00
sewer_category
Gravity