Wastewater/Activity/PacpInspection/1.0Feb 2, 2017, 07:10 AM
  • 14 0243_14 0242 _02012017_231302.mp4

Date
02/01/2017
W/O
613594
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18296
Time
11:10 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4228
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
WO_613594_TV14037_JAN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0243
Downstream MH
14 0242
Dir. of Survey
Downstream
Length Surveyed
596.3 ft.
Total Length
596.3 ft.
Structural Index
3
Structural Quick
3W00
Structural Rating
354
O&M Index
2
O&M Quick
412W
O&M Rating
240
Overall Index
3
Overall Quick
Overall Rating
594
Pipe schematic from manhole 14 0243 to 14 0242
MH: 14 0243MH: 14 0242downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02432.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAG COATING 80%2.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start593.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish593.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish596.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0242

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
2.2DAGS
2.2MGOMAG COATING 80%
0MWL
593.9DAGS
0MWM
2.2SAP
596.3AMH14 0242
593.9SAP
0AMH14 0243

Properties (4)

additional_info
SC306730
custom_field_two
3
customer
LACSD
datetime
2017-02-01T23:10:50-08:00