Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2017, 09:43 AM
  • 22 0470_22 0469 _01122017_014411.mp4

Date
01/12/2017
W/O
613449
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00816
PipeID
P16808
Time
1:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4208
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_613449_TV22048_JAN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0470
Downstream MH
22 0469
Dir. of Survey
Downstream
Length Surveyed
275 ft.
Total Length
275 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
253
Pipe schematic from manhole 22 0470 to 22 0469
MH: 22 0470MH: 22 0469downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 04700 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start126.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start126.8 ft. MMC - Material Change, Concrete pipe (non-reinfored)126.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start166.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"234.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"273.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish275 ft. AMH - Downstream Manhole, Survey Ends - 22 0469

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    126.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    126.8 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    126.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
275AMH22 0469
126.8SAP
2DAGS
0MWM
126.8MMC
273.7SSS
0AMH22 0470
234.6TFA
273.7SAP
126.8SSS
273.7DAGS
0MWL
166.5TFA

Properties (4)

additional_info
SC306710
custom_field_two
4
customer
LACSD
datetime