Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2017, 10:49 AM
  • 02 2273_02 1702_01112017_024945.mp4

Date
01/11/2017
W/O
613349
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00289
PipeID
P18862
Time
2:49 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4207
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
MONTEREY PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
06
Purpose
Routine Assessment
Project
WO_613349_TV02103_JAN2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1702
Downstream MH
02 2273
Dir. of Survey
Upstream
Length Surveyed
222.2 ft.
Total Length
222.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2H00
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
88
Pipe schematic from manhole 02 1702 to 02 2273
MH: 02 1702MH: 02 2273upstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 4 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 02 22730.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 10 O'CLOCK25.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"32.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"36 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"100.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"123.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"159.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"207.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"211.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"215 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"220.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start222.2 ft. MWM - Water Mark, 30 %of cross sectional area222.2 ft. MWL - Water Level, 10 %of cross sectional area222.2 ft. AMH - Downstream Manhole, Survey Begins - 02 1702

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
221.5DAGS
16.9TBA
63TFC
14.5TFC
0MWM
125.2TFA
7.2TFC
98.9TBA
0MWL
65.9TFC
197.1TFC
222.2MGOACTIVE CONNECTION AT MH 4 O'CLOCK
186.2TFC
221.5MGOACTIVE CONNECTION AT MH 10 O'CLOCK
122.1TFC
0AMH02 1702
2DAGS
189.9TBA
222.2AMH02 2273
10.3TBA

Properties (5)

additional_info
SC306709
custom_field_two
4
customer
LACSD
datetime
2017-01-11T02:49:25-08:00
sewer_category
Gravity