Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 14, 2016, 11:44 AM
  • 32 1141_32 1140 _12142016_034448.mp4

Date
12/14/2016
W/O
607627
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00842
PipeID
P19593
Time
3:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4035
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTION 5
City
CANYON COUNTRY
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
12
Purpose
Routine Assessment
Project
WO_607627_TV32024_DEC2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 1141
Downstream MH
32 1140
Dir. of Survey
Downstream
Length Surveyed
350.8 ft.
Total Length
350.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2Q00
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
184
Pipe schematic from manhole 32 1141 to 32 1140
MH: 32 1141MH: 32 1140downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11412 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS16.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"117.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish142.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"315.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"350 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish350.8 ft. AMH - Downstream Manhole, Survey Ends - 32 1140350.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    6.1 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (14)

DistanceCodeObservation
350.8AMH32 1140
350.8MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
6.1DSZDEBRIS
142.2TF
64.2TFC
0MWM
0AMH32 1141
2DAGS
350DAGS
237.4TFC
117.8DSZ
315.1TF
16.2TFC

Properties (5)

additional_info
SC306431
custom_field_two
4
customer
LACSD
datetime
2016-12-14T03:44:31-08:00
sewer_category
Gravity