Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 21, 2016, 08:10 AM
  • 14 0506_14 0505A_12212016_001112.mp4

Date
12/21/2016
W/O
607671
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18596
Time
12:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4039
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
WO_607671_TV14070_DEC2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0506
Downstream MH
14 0505A
Dir. of Survey
Downstream
Length Surveyed
74 ft.
Total Length
74 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 14 0506 to 14 0505A
MH: 14 0506MH: 14 0505Adownstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 05062 ft. MGO - General Observation - MAG COATING 80%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"43.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"71.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish71.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish74 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK74 ft. AMH - Downstream Manhole, Survey Ends - 14 0505A

Observation photos (3)

  • General Observation - MAG COATING 80%

    2 ft. - General Observation - MAG COATING 80%

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWM
2MGOMAG COATING 80%
2DAGS
71.6DAGS
68TFC
71.6SAP
74MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
2SAP
74AMH14 0505A
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
43.8TFC
0AMH14 0506
19.3TFC

Properties (4)

additional_info
SC306437
custom_field_two
3
customer
LACSD
datetime
2016-12-21T00:10:46-08:00