Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 21, 2016, 06:57 AM
  • 14 0508_14 0507_12202016_225847.mp4

Date
12/20/2016
W/O
607671
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18599
Time
10:57 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4039
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
WO_607671_TV14070_DEC2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0508
Downstream MH
14 0507
Dir. of Survey
Downstream
Length Surveyed
197.4 ft.
Total Length
197.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
5121
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 14 0508 to 14 0507
MH: 14 0508MH: 14 0507downstream0 ft. MWM - Water Mark, 75 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 05080 ft. MWL - Water Level, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING 80%16.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"41.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"143.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"168.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"195.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish195.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish197.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0507197.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING 80%

    2 ft. - General Observation - MAG COATING 80%

Observations (19)

DistanceCodeObservation
0MWM
195.9SAP
197.4AMH14 0507
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SAP
0AMH14 0508
2DAGS
41.2TFC
94.2TFC
188.6TFC
197.4MGOACTIVE CONNECTION AT MH 9 O'CLOCK
16.7TFC
69.9TFC
0MWL
168.1TFC
118.7TFC
195.9DAGS
143.7TFC
2MGOMAG COATING 80%

Properties (4)

additional_info
SC306437
custom_field_two
3
customer
LACSD
datetime
2016-12-20T22:57:28-08:00