03 0433_03 0432_692017_051613.mp4
2 ft. - General Photograph - REBAR
2 ft. - Surface Reinforcement Corroded, from 12 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM& LONG REBAR
8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
25.6 ft. - Deposits Settled Other, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - SLUDGE
144.4 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - CIRCUM & LONG REBAR
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 4:45AM |
| 144.4 | SRV | CIRCUM & LONG REBAR |
| 8 | SSS | BLISTERING PEELING CONCRETE |
| 173.5 | DSZ | SLUDGE |
| 6.5 | SRC | CIRCUM & LONG REBAR |
| 173.5 | SAP | — |
| 8 | SAM | SEVERE AGG |
| 173.7 | AMH | 5:05AM |
| 173.5 | SAM | — |
| 8 | SAP | SEVERE AGG SPORATIC |
| 173.5 | SSS | — |
| 2 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 173.5 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 2 | DSZ | SLUDGE |
| 25.6 | DSZ | SLUDGE |
| 8 | DSZ | SLUDGE |
| 0 | MWL | — |
| 2 | MGP | REBAR |
| 2 | SRC | CIRCUM& LONG REBAR |