Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2017, 02:47 PM
  • 29 0771_29 0770_682017_080255.mp4

  • 29 0771_29 0770_682017_080613.mp4

  • 29 0771_29 0770_682017_081602.mp4

Date
06/08/2017
W/O
0640601
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01090
PipeID
P24671
Time
7:47 AM
Certificate
415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7430
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
20170608DF_ALAMITOS_P_P_SEWER
Material
Ductile Iron Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0771
Downstream MH
29 0770
Dir. of Survey
Downstream
Length Surveyed
149.9 ft.
Total Length
149.9 ft.
Structural Index
3
Structural Quick
4137
Structural Rating
31
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
31
Pipe schematic from manhole 29 0771 to 29 0770
MH: 29 0771MH: 29 0770downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 7:50 AM0.1 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - ROACHES @ MH7 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES20 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.2 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES40.8 ft. MGP - General Photograph - SPALLING45 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open46.6 ft. CM - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES56.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4"58.5 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES64.2 ft. FS - Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES67.2 ft. CM - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES73.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES89.1 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4", 4"90.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES91.6 ft. MGP - General Photograph - CHIPPING93.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES94.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open103.2 ft. MMC - Material Change, Vitrified clay pipe103.2 ft. MGP - General Photograph105.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open108 ft. MGP - General Photograph - SPALLING108 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open113 ft. MGP - General Photograph113 ft. MMC - Material Change, Dictile Iron144.5 ft. MGP - General Photograph - SPALLING148.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish148.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish149.9 ft. MGO - General Observation - ROACHES @ MH149.9 ft. AMH - Downstream Manhole, Survey Ends - 8:46 AM

Observation photos (19)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    35.2 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph - SPALLING

    40.8 ft. - General Photograph - SPALLING

  • Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

    46.6 ft. - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    58.5 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES

    64.2 ft. - Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

    67.2 ft. - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    73.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    90.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph - CHIPPING

    91.6 ft. - General Photograph - CHIPPING

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    93.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Material Change, Vitrified clay pipe

    103.2 ft. - Material Change, Vitrified clay pipe

  • General Photograph

    103.2 ft. - General Photograph

  • General Photograph - SPALLING

    108 ft. - General Photograph - SPALLING

  • General Photograph

    113 ft. - General Photograph

  • Material Change, Dictile Iron

    113 ft. - Material Change, Dictile Iron

  • General Photograph - SPALLING

    144.5 ft. - General Photograph - SPALLING

Observations (33)

DistanceCodeObservation
148.7CM
46.6CM
58.5CL
148.7SSS
56.5TF
67.2CM
0.1MWM
90.8FL
149.9MGOROACHES @ MH
105.5TFOpen
89.1TFA
94.5TFOpen
64.2FS
149.9AMH8:46 AM
103.2MMC
2SSS
91.6MGPCHIPPING
108MGPSPALLING
0MWL
35.2CL
108TFOpen
2MGOROACHES @ MH
0AMH7:50 AM
40.8MGPSPALLING
73.1FL
93.8FL
7FM
113MGP
144.5MGPSPALLING
45TFOpen
113MMC
20CM
103.2MGP

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-06-08T07:47:20-07:00