Wastewater/Activity/PacpInspection/1.0Feb 16, 2016, 08:22 PM
  • H 0941_H 0940_20160216_133519.mp4

Date
02/16/2016
W/O
552579
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z01005
PipeID
P15354
Time
12:22 PM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3181
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
33
Purpose
Routine Assessment
Project
WO_552579_TV21022_FEB2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
H 0941
Downstream MH
H 0940
Dir. of Survey
Downstream
Length Surveyed
468.7 ft.
Total Length
468.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole H 0941 to H 0940
MH: H 0941MH: H 0940downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 09410 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. MGO - General Observation - MAGNEZIUM H.O COATING 50% start41.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start466.6 ft. MGO - General Observation - MAGNEZIUM H.O COATING 50% finish466.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish468.7 ft. AMH - Downstream Manhole, Survey Ends - H 0940

Observation photos (1)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    41.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

Observations (8)

DistanceCodeObservation
0MWL
0AMHH 0941
466.6MGOMAGNEZIUM H.O COATING 50% finish
41.6SSS
466.6SSS
468.7AMHH 0940
2MGOMAGNEZIUM H.O COATING 50% start
0MWM

Properties (5)

additional_info
SC224996
custom_field_two
4
customer
LACSD
datetime
2016-02-16T12:22:08-08:00
sewer_category
GRAVITY