Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2016, 11:28 AM
  • 05 0341_05 0340 _02122016_032829.mp4

Date
12/02/2016
W/O
602767
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00432
PipeID
P05555
Time
3:28 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3841
Sewer Name
05 DISTRICT #5 MAIN RELIEF TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
WO_602767_TV05325_NOV2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
05 0341
Downstream MH
05 0340
Dir. of Survey
Downstream
Length Surveyed
452 ft.
Total Length
452 ft.
Structural Index
4
Structural Quick
5Q3Q
Structural Rating
717
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
4
Overall Quick
Overall Rating
722
Pipe schematic from manhole 05 0341 to 05 0340
MH: 05 0341MH: 05 0340downstream0 ft. MWM - Water Mark, 75 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 03410 ft. MWL - Water Level, 65 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK4.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - VISIBLE REBAR AND RIBCAGE EFFECT4.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start451.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish452 ft. AMH - Downstream Manhole, Survey Ends - 05 0340452 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - VISIBLE REBAR AND RIBCAGE EFFECT

    4.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - VISIBLE REBAR AND RIBCAGE EFFECT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

    451.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observations (9)

DistanceCodeObservation
4.2SRVVISIBLE REBAR AND RIBCAGE EFFECT
4.2SAP
0MWM
451.2SAP
0AMH05 0341
0MWL
0MGOCONNECTION AT THE MH 3 O'CLOCK
452AMH05 0340
452SRV

Properties (4)

additional_info
SC304591
custom_field_two
2
customer
LACSD
datetime
2016-12-02T03:28:11-08:00