Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 16, 2016, 07:14 AM
  • 02 1162_02 1161_15112016_231417.mp4

Date
11/15/2016
W/O
602603
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00351
PipeID
P02946
Time
11:14 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3825
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
WO_602603_TV02060_NOV2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
02 1162
Downstream MH
02 1161
Dir. of Survey
Downstream
Length Surveyed
232.9 ft.
Total Length
233 ft.
Structural Index
3
Structural Quick
3F12
Structural Rating
101
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
101
Pipe schematic from manhole 02 1162 to 02 1161
MH: 02 1162MH: 02 1161downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 11620 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area5.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"29.9 ft. JOM - Joint Offset Medium34.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"83 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"145.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish224.7 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES233 ft. AMH - Downstream Manhole, Survey Ends - 02 1161

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    6.5 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Joint Offset Medium

    29.9 ft. - Joint Offset Medium

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    145.7 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

    224.7 ft. - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
5.5CM
168.7CM
0AMH02 1162
224.7CC
29.9JOM
83TF
6.5TB
0MWM
34.8TF
233AMH02 1161
145.7TB
133.7TFC
0MWL

Properties (5)

additional_info
SC304574
custom_field_two
3
customer
LACSD
datetime
2016-11-15T23:14:07-08:00
sewer_category
Gravity