Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2016, 07:27 AM
  • 01 0527A_01 0527_07112016_232734.mp4

Date
11/07/2016
W/O
602233
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00206
PipeID
P01014
Time
11:27 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3874
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_602233_TV01017_NOV2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0527
Downstream MH
01 0527A
Dir. of Survey
Upstream
Length Surveyed
341.8 ft.
Total Length
341.8 ft.
Structural Index
4
Structural Quick
4100
Structural Rating
4
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 01 0527 to 01 0527A
MH: 01 0527MH: 01 0527Aupstream0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Ends - 01 0527A3.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish85.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"88.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"144.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"146.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"186.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"224.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"227.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"275.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"278.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"339.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES339.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start341.8 ft. MWM - Water Mark, 15 %of cross sectional area341.8 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK ACTIVE341.8 ft. MWL - Water Level, 10 %of cross sectional area341.8 ft. MGO - General Observation - ROACHES IN MH341.8 ft. AMH - Downstream Manhole, Survey Begins - 01 0527

Observation photos (12)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    63.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    66.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    114.3 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    117.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    155.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    194.9 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    197.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    253.7 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    256.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    337.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (19)

DistanceCodeObservation
2.1DAGS
66.2TFC
256.3TFC
341.8MGOLATERAL AT MH 3 OCLOCK ACTIVE
0MWM
114.3TFC
0MGOLATERAL AT MH 3 OCLOCK ACTIVE
194.9TFC
253.7TFC
337.9DAGS
197.1TFC
341.8AMH01 0527A
0MWL
155.7TFC
2.5FM
0MGOROACHES IN MH
63.7TFC
0AMH01 0527
117.1TFC

Properties (5)

additional_info
SC305204
custom_field_two
3
customer
LACSD
datetime
2016-11-07T23:27:14-08:00
sewer_category
Gravity