29 0517_29 0516A_672017_112230.mp4
29 0517_29 0516A_672017_112640.mp4
8.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
26.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
27.1 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES
28.5 ft. - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"
31.3 ft. - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"
35.5 ft. - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES
38.7 ft. - Crack Longitudinal, at 07 o'clock, within 8 inches of joint: YES, Start
42 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES
51.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
57.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
63.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
66.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES
67.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 27.1 | CL | — |
| 32.6 | CM | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 63.4 | CM | — |
| 31.3 | TFA | — |
| 35.5 | CM | — |
| 66.3 | CL | — |
| 28.5 | TFA | — |
| 51.2 | CM | — |
| 42 | CL | — |
| 38.7 | CL | — |
| 42 | CL | — |
| 38.7 | CM | — |
| 67.5 | AMH | LAMP HOLE AT MH 516A, BROKEN, END OF SET UP 11:45 AM |
| 44.8 | CM | — |
| 8.1 | SSS | — |
| 8.1 | DAGS | — |
| 67.2 | DAGS | — |
| 26.5 | CM | — |
| 57.7 | CM | — |
| 67.3 | SSS | — |
| 0 | AMH | 11:20 AM |