Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2017, 03:30 PM
  • 29 0529_29 0515_662017_092337.mp4

Date
06/06/2017
W/O
0641042
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z01106
PipeID
P24583
Time
8:30 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7427
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20170606MI_19TH_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0529
Downstream MH
29 0515
Dir. of Survey
Downstream
Length Surveyed
330.1 ft.
Total Length
330.1 ft.
Structural Index
3
Structural Quick
3721
Structural Rating
24
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
28
Pipe schematic from manhole 29 0529 to 29 0515
MH: 29 0529MH: 29 0515downstream0 ft. MGO - General Observation - ROACHES > 50 AT MH0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 09:30AM0 ft. MWM - Water Mark, 25 %of cross sectional area8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start20.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES27.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"42.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES50.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES52.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"56.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES89.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES105.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"109.6 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"111.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"205.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"207.3 ft. CC - Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES208.5 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"225.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES259.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"286.1 ft. RTJ - Roots Tap Joint, from 03 to 04 o'clock, 5 %, within 8 inches of joint: YESR300.7 ft. CM - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES327.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish330.1 ft. AMH - Downstream Manhole, Survey Ends - 10:00 AM330.1 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    20.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    50.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    56.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

    207.3 ft. - Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Roots Tap Joint, from 03 to 04 o'clock, 5 %, within 8 inches of joint: YESR

    286.1 ft. - Roots Tap Joint, from 03 to 04 o'clock, 5 %, within 8 inches of joint: YESR

  • Downstream Manhole, Survey Ends - 10:00 AM

    330.1 ft. - Downstream Manhole, Survey Ends - 10:00 AM

Observations (27)

DistanceCodeObservation
330.1AMH10:00 AM
27.5TFA
0MGOROACHES > 50 AT MH
42.3CM
300.7CM
52.2TFA
0MWL
207.3CC
105.5TFA
111.6TFA
259.7TFC
225.7CM
20.3CM
8.1DAGS
8SSS
286.1RTJ
327.7SSS
0AMH09:30AM
89.7CM
109.6TBA
208.5TFA
330.1MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
205.6TFA
0MWM
50.8CM
56.5CM
327.7DAGS

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-06-06T08:30:42-07:00