29 0529A_29 0529_662017_083526.mp4
8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
29.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
43.8 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - 5% DEBRIS
47.5 ft. - Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES
146 ft. - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"
201.7 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN
250.8 ft. - Upstream Manhole, Survey Ends - LAMP HOLE AT MH 529A
| Distance | Code | Observation |
|---|---|---|
| 47.5 | CC | — |
| 8 | SSS | — |
| 0 | AMH | 08:40 AM |
| 107.6 | CL | — |
| 0 | MWM | — |
| 1.7 | MGO | ROACHES > 50 |
| 46.3 | TFA | — |
| 250.8 | SSS | — |
| 194.7 | TFA | — |
| 146 | TFA | — |
| 250.8 | DAGS | — |
| 201.7 | TB | OPEN |
| 241.6 | TFA | — |
| 250.8 | AMH | LAMP HOLE AT MH 529A |
| 215 | TFA | — |
| 29.8 | DAGS | — |
| 206.7 | CM | — |
| 43.8 | TFD | 5% DEBRIS |
| 248.2 | TFA | — |
| 100.6 | TFA | — |
| 0 | MWL | — |
| 22.4 | CL | — |