Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2017, 08:59 PM
  • 29 0521_29 0520_652017_140135.mp4

Date
06/05/2017
W/O
0641042
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01106
PipeID
P24574
Time
1:59 PM
Certificate
415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7426
Sewer Name
29 19TH STREET SEWER
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20170605DF_19TH_ST_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0521
Downstream MH
29 0520
Dir. of Survey
Downstream
Length Surveyed
104.5 ft.
Total Length
104.5 ft.
Structural Index
2
Structural Quick
3222
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 29 0521 to 29 0520
MH: 29 0521MH: 29 0520downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:59 PM0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. CS - Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES16 ft. JOM - Joint Offset Medium, 1"18.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"19.3 ft. JOM - Joint Offset Medium, 1"23 ft. CM - Crack Multiple, from 01 to 03 o'clock, within 8 inches of joint: YES25.6 ft. MWM - Water Mark, 20 %of cross sectional area25.6 ft. MWL - Water Level, 15 %of cross sectional area31.7 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - 35% BLOCKED69.8 ft. MGP - General Photograph - SPALLING90.3 ft. MMC - Material Change, Other (state in comments) - PLASTIC-LIKE MESH90.3 ft. MGP - General Photograph91.3 ft. MMC - Material Change, Other (state in comments) - PLASTIC-LIKE MESH104.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish104.5 ft. MGO - General Observation - ROACHES @ MH104.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish104.5 ft. AMH - Downstream Manhole, Survey Ends - 2:20 PM

Observation photos (8)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES

    3.1 ft. - Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 01 to 03 o'clock, within 8 inches of joint: YES

    23 ft. - Crack Multiple, from 01 to 03 o'clock, within 8 inches of joint: YES

  • Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - 35% BLOCKED

    31.7 ft. - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - 35% BLOCKED

  • General Photograph - SPALLING

    69.8 ft. - General Photograph - SPALLING

  • Material Change, Other (state in comments) - PLASTIC-LIKE MESH

    90.3 ft. - Material Change, Other (state in comments) - PLASTIC-LIKE MESH

  • General Photograph

    90.3 ft. - General Photograph

  • Material Change, Other (state in comments) - PLASTIC-LIKE MESH

    91.3 ft. - Material Change, Other (state in comments) - PLASTIC-LIKE MESH

Observations (22)

DistanceCodeObservation
0AMH1:59 PM
19.3JOM
2SSS
3.1CS
25.6MWM
31.7TF35% BLOCKED
90.3MMCPLASTIC-LIKE MESH
104.5CM
104.5MGOROACHES @ MH
90.3MGP
0MGOROACHES @ MH
18.3TFA
0MWL
69.8MGPSPALLING
23CM
25.6MWL
16JOM
0MWM
104.5SSS
104.5AMH2:20 PM
2CM
91.3MMCPLASTIC-LIKE MESH

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-06-05T13:59:01-07:00