Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2017, 05:41 PM
  • 29 0523_29 0522_652017_104927.mp4

Date
06/05/2017
W/O
0641042
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01106
PipeID
P24575
Time
10:41 AM
Certificate
415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7425
Sewer Name
29 19TH STREET SEWER
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20170605DF_19TH_ST_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0523
Downstream MH
29 0522
Dir. of Survey
Downstream
Length Surveyed
184.3 ft.
Total Length
184.3 ft.
Structural Index
3
Structural Quick
3623
Structural Rating
24
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
27
Pipe schematic from manhole 29 0523 to 29 0522
MH: 29 0523MH: 29 0522downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:42 AM0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.2 ft. CM - Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES32.1 ft. CM - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES73.7 ft. FC - Fracture Circumferential, from 12 to 05 o'clock, within 8 inches of joint: YES73.7 ft. MGP - General Photograph75.8 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"79.1 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES136.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open139.5 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES156.8 ft. CM - Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES157.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open161.7 ft. CM - Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES184.3 ft. MGP - General Photograph184.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish184.3 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES184.3 ft. MSA - Survey Abandoned - DEBRIS184.3 ft. MGP - General Photograph184.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (12)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

    6.2 ft. - Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

    32.1 ft. - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 12 to 05 o'clock, within 8 inches of joint: YES

    73.7 ft. - Fracture Circumferential, from 12 to 05 o'clock, within 8 inches of joint: YES

  • General Photograph

    73.7 ft. - General Photograph

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    79.1 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    139.5 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES

    156.8 ft. - Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open

    157.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open

  • Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES

    161.7 ft. - Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 15 %of cross sectional area, from 06 to 07 o'clock,  , within 8 inches of joint: YES

    184.3 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES

  • General Photograph

    184.3 ft. - General Photograph

Observations (23)

DistanceCodeObservation
75.8TFA
157.5TBOpen
73.7FC
184.3MGP
184.3CM
184.3DAGS
139.5CM
0AMH10:42 AM
0MGOROACHES @ MH
73.7MGP
161.7CM
136.9TFOpen
0MWM
6.2CM
32.1CM
184.3MSADEBRIS
184.3MGP
79.1CL
2CM
2SSS
184.3SSS
156.8CM
0MWL

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-06-05T10:41:52-07:00