Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2016, 07:21 AM
  • 14 0536_14 0535B_02032016_232142.mp4

Date
03/02/2016
W/O
552346
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18627
Time
11:21 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3274
Sewer Name
14 35TH STREET WEST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
11
Purpose
Routine Assessment
Project
WO_552346_TV14042_FEB2016
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
14 0536
Downstream MH
14 0535B
Dir. of Survey
Downstream
Length Surveyed
194.7 ft.
Total Length
194.7 ft.
Structural Index
1
Structural Quick
1G00
Structural Rating
38
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
1
Overall Quick
Overall Rating
42
Pipe schematic from manhole 14 0536 to 14 0535B
MH: 14 0536MH: 14 0535Bdownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 05360 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.2 ft. MGO - General Observation - MAG COATING 20%192 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish194.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK194.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0535B194.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
194.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH14 0536
194.5DAGS
0MWL
0MWM
192SRI
2SRI
5.2MGOMAG COATING 20%
2DAGS
194.7AMH14 0535B
194.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (5)

additional_info
SC225498
custom_field_two
4
customer
LACSD
datetime
2016-03-02T23:21:17-08:00
sewer_category