08 0218_08 0217 _08312016_014747.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
7.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
43.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start
108.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
260.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 7.2 | CM | — |
| 260.9 | TFA | — |
| 185 | TFC | — |
| 0 | AMH | 08 0218 |
| 336.4 | TFC | — |
| 422 | DAGS | — |
| 108.3 | DAGS | — |
| 37.4 | TFC | — |
| 424.7 | AMH | 08 0217 |
| 0 | MWL | — |
| 412.3 | TFC | — |
| 422 | CM | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 420.3 | DAE | — |
| 2 | DAGS | — |
| 424.7 | MGO | CAPPED CONNECTION AT MH 9 O'CLOCK |
| 260.9 | DAGS | — |
| 108.5 | TFA | — |
| 43.8 | DAE | — |
| 424.7 | MGO | CAPPED CONNECTION AT MH 3 O'CLOCK |
| 0 | MWM | — |