Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2016, 08:46 AM
  • 22 0252_22 0251_20160105_020817.mp4

Date
01/05/2016
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16534
Time
12:46 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3024
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0252
Downstream MH
22 0251
Dir. of Survey
Downstream
Length Surveyed
322.5 ft.
Total Length
322.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
3223
O&M Rating
19
Overall Index
2
Overall Quick
Overall Rating
22
Pipe schematic from manhole 22 0252 to 22 0251
MH: 22 0252MH: 22 0251downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02520 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. VC - Vermin Cockroach2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAGNESIUM H.O. START2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"79.8 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES86.1 ft. RMJ - Roots Medium Joint, from 03 to 05 o'clock, 20 %, within 8 inches of joint: YESR96.5 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4" - ROOTS INSIDE98.4 ft. RFJ - Roots Fine Joint, from 11 to 01 o'clock, within 8 inches of joint: YES101.5 ft. RFJ - Roots Fine Joint, at 02 o'clock, within 8 inches of joint: YES107.2 ft. RFJ - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YES119.4 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR126.5 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4" - ROOTS INSIDE SEVERE128.5 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES145.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"149.8 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start164 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish197.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"252 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"255.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"291.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"319.4 ft. MGO - General Observation - MAGNESIUM H.O. FINISH319.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish321.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0251322.5 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Joint, from 03 to 05 o'clock, 20 %, within 8 inches of joint: YESR

    86.1 ft. - Roots Medium Joint, from 03 to 05 o'clock, 20 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR

    119.4 ft. - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR

Observations (30)

DistanceCodeObservation
252TFA
319.4MGOMAGNESIUM H.O. FINISH
86.1RMJ
0AMH22 0252
101.5RFJ
255.4TFA
98.4RFJ
126.5TFDROOTS INSIDE SEVERE
107.2RFJ
0MWL
2.4DAGS
322.5AMH22 0251
319.4DAGS
79.8RFJ
322.5MGOLATERAL AT MH 3 O'CLOCK ACTIVE
30.4TFA
2.4MGOMAGNESIUM H.O. START
0MGOLATERAL AT MH 3 O'CLOCK ACTIVE
197.6TFA
0MWM
119.4RMJ
0VC
96.5TFDROOTS INSIDE
149.8RFJ
164RFJ
321.1SAP
291.5TFC
128.5RFJ
2.4SAP
145.6TFC

Properties (5)

additional_info
SC224617
custom_field_two
3
customer
LACSD
datetime
2016-01-05T00:46:03-08:00
sewer_category
GRAVITY