Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2016, 07:28 AM
  • 22 0254_22 0253_20160105_004330.mp4

Date
01/04/2016
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16536
Time
11:28 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3024
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0254
Downstream MH
22 0253
Dir. of Survey
Downstream
Length Surveyed
275.9 ft.
Total Length
275.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 22 0254 to 22 0253
MH: 22 0254MH: 22 0253downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 22 02540.1 ft. VC - Vermin Cockroach2.3 ft. MGO - General Observation - MAGNESIUM H.O. START2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"6.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"41.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"78 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"81.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"154 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"156.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"205.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"208.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"270.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270.5 ft. MGO - General Observation - MAGNESIUM H.O. FINISH275.9 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE275.9 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE275.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0253

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
0MWL
275.9MGOLATERAL AT MH 9 O'CLOCK ACTIVE
81.1TFC
6.6TFC
270.5SAP
0MWM
0MGOLATERAL AT MH 9 O'CLOCK ACTIVE
275.9MGOLATERAL AT MH 3 O'CLOCK ACTIVE
275.9AMH22 0253
208.5TFC
3.8TF
78TF
41.2TFC
0.1VC
0AMH22 0254
154TF
2.3MGOMAGNESIUM H.O. START
270.5MGOMAGNESIUM H.O. FINISH
2.3SAP
205.2TF
156.8TFC

Properties (5)

additional_info
SC224617
custom_field_two
3
customer
LACSD
datetime
2016-01-04T23:28:23-08:00
sewer_category
GRAVITY