Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2016, 07:04 AM
  • 22 0256_22 0255_20160105_001634.mp4

Date
01/04/2016
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16538
Time
11:04 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3024
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0256
Downstream MH
22 0255
Dir. of Survey
Downstream
Length Surveyed
154.7 ft.
Total Length
154.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 22 0256 to 22 0255
MH: 22 0256MH: 22 0255downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02562.8 ft. MGO - General Observation - MAGNESIUM H.O. START2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18.5 ft. VC - Vermin Cockroach18.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"21.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"67.7 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4"73.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"88.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"112.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"143.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"152.6 ft. MGO - General Observation - MAGNESIUM H.O. FINISH152.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish154.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0255

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
88.1TFC
154.7AMH22 0255
2.8MGOMAGNESIUM H.O. START
67.7TB
2.8SAP
112.7TFC
152.6MGOMAGNESIUM H.O. FINISH
21.8TF
18.5VC
152.6SAP
73.2TFC
0MWM
0MGOLATERAL AT MH 9 O'CLOCK ACTIVE
0MWL
18.5TFC
143.2TF
0AMH22 0256

Properties (5)

additional_info
SC224617
custom_field_two
3
customer
LACSD
datetime
2016-01-04T23:04:44-08:00
sewer_category
GRAVITY